2019年9月2日星期一

Stainless steel corrosion-resistant pump before the installation preparation

Stainless steel corrosion-resistant stainless steel pump with reliable performance, good sealing performance, attractive appearance, easy maintenance, etc., then install the pump, you need to be prepared? With this question, the following small series We will introduce stainless steel corrosion-resistant pump installation preparation. Pre-Installation Preparation for Stainless Steel Corrosion Resistant Pumps 1. Check the equipment drawings for the main dimensions of the pump, the location of the connections and anchor bolts, and more. 2. Choose a reasonable installation location, to ensure smooth pump operation, to avoid resonance, in order to extend the life of the pump. 3. The necessary tools must be prepared prior to installation, equipped with suitable lifting equipment and adequate light when required, and large parts must be provided with suitable space and access to the mounting location for easy installation and adjustment of the pump. 4. Before installing the pipeline, in order to protect the pump, the pump flange and the larvae L on the screw thread should not be torn off so as to avoid human debris. The pump must be covered during installation. 5. For the shaft seal, pump outlet, cooling system, etc. must provide a pressure drain conditions, so as not to pollute the environment. 6. After the pump foundation and related civil works are completed, the concrete reaches an effective curing period, the strength reaches the prescribed standard, and after review and acceptance, the pump can be installed in place. Read more: China Building Water Exhibition Pump Valve Tube Fittings Exhibition Water Expo Xiamen Maritime Exhibition Internet + Forum Yiwu Expo Industry Interconnection (Xiamen) Technology Co., Ltd. Asia Pump Network Editor: He Duanhui (QQ / WeChat:) http://beng.liuti.cn/ (service hotline:)

1. Use Surface Mount System to install electron component. High quality stable and more quality consistency.

2. Pass germany TUV testing, have EMC and LVD certificate.

3. The AC input power voltage is made between 85V to 240V. So it could select AC input voltage automatically. You could work in AC USA 110V or AC europe 220-240V.

4. CEL: Cellulose electrode is special electrode to lay big pipe on oil and chemical industry, natural gas, electric power, civil pipeline of oil, gas, water. They need high ilder voltage (more than 90V). This machine could do

Inverter DC MIG Welder

MIG Welders, Miller MIG Welder, Used Welders

YongKang WALMA Tools CO., LTD. , http://www.walmatools.com

没有评论:

发表评论