IHF-lined fluorine plastic centrifugal pump installation considerations

IHF-lined fluorine plastic centrifugal pump installation quality is related to the quality of the use of the pump, and even affect the life of the pump, then install the pump, you should pay attention to what matters? The following is about the IHF Lining fluorine plastic centrifugal pump installation considerations introduced. IHF-lined fluorine plastic centrifugal pump installation precautions 1, the pump is installed properly, the normal operation of the pump and the life has a very important impact, so the installation and calibration must be carefully carried out. 2, according to the installation of the size of the anchor bolts, do a good job of concrete foundation. 3, to be based on the foundation cement solidification, the pump installed on the basis of the level of the pump and motor shaft level check, if not level, the use of horns until the level of leveling, tighten the foot nut after adjustment, 4, check the pump Rotating components are stuck rub phenomenon should be strictly check the pump shaft and motor concentricity can be adjusted to make it concentric slices, and finally by hand rotating coupling, rotating evenly without rubbing phenomenon is normal. 5, the pump suction and discharge pipe should have their own bracket, does not allow the weight of the pipe directly by the pump to bear, so as not to damage the pump, 6, the pump installed above the surface level (in the suction pump allows Range), the end of the suction pipe should be installed on the end of the valve, and set in the discharge pipe irrigation screw or valve for the pump before the start of irrigation fluid; pump installed below the level should be In the suction pipe installed by the control valve and filtration devices to prevent debris sucked into the pump, the filter area should be greater than 3-4 times the pipe area. 7, lift the pump in the outlet flow control valve on the outer pipe should also be installed check valve to prevent water hammer damage suddenly shut down. 8, must ensure that the pump installation height in line with the pump NPSH, and consider the pipeline loss and medium temperature. Read more: China Building Water Exhibition Pump Valve Tube Fittings Exhibition Water Expo Xiamen Maritime Exhibition Internet + Forum Yiwu Expo Industry Interconnection (Xiamen) Technology Co., Ltd. Asia Pump Network Editor: He Duanhui (QQ / WeChat:) http://beng.liuti.cn/ (service hotline:)

Magnetic Receptive Sheet&roll

Flat Magnetic Sheet,Soft Rubber Magnetic Sheet,Magnetic Sheet

Maghard Flexible Magnet Co., Ltd. , http://www.dg-magnet.com

没有评论:

发表评论