2019年9月24日星期二

Vertical pipeline pump start requirements

Vertical pipe pump with high efficiency and energy saving, low noise, easy installation and maintenance and other characteristics, then start the pump, what kind of requirements? Here is the introduction of the vertical pipe pump start requirements. Vertical pipeline pump start requirements 1) full import valve. 2) Close the outlet pipe valve. 3) Start the motor, observe the pump is running correctly. 4) adjust the outlet valve opening to the required conditions, such as the user at the pump outlet with a flow meter or pressure gauge, the outlet valve should be adjusted by the opening of the pump performance parameters listed in the rated point on the run and through Adjust the opening of the outlet valve and measure the motor current of the pump so that the motor runs within the rated current or else the pump will be overloaded (ie high current) to burn the motor. Adjust the outlet valve opening degree and pipeline conditions. 5) Check the seal leakage. Sui situation, the normal mechanical seal leakage should be less than 3r per hour. iL (no leak). 6) Check electric 杌, bearing temperature should be ≤ 70 ℃. Read more: China Building Water Exhibition Pump Valve Tube Fittings Exhibition Water Expo Xiamen Maritime Exhibition Internet + Forum Yiwu Expo Industry Interconnection (Xiamen) Technology Co., Ltd. Asia Pump Network Editor: He Duanhui (QQ / WeChat:) http://beng.liuti.cn/ (service hotline:)

Other PVC Curtain Track

Plastic Curtain Rod,Plastic Curtain Pole,Bendable Curtain Rail

Shenzhou Yuye Housewares Co., Ltd. , http://www.fscurtainrod.com

没有评论:

发表评论